首页> 外文期刊>Journal of Korean Forestry Society >An Economic Feasibility Study of AR CDM projectin North Korea
【24h】

An Economic Feasibility Study of AR CDM projectin North Korea

机译:朝鲜CDM项目的经济可行性研究

获取原文
获取原文并翻译 | 示例
           

摘要

Potentials of AR CDM project in North Korea are assessed and feasible land area for AR CDM project is estimated. According to our estimation, There could be 515,000 hectares of forest lands deforested before 1990 in North Korea and 8,854 hectares at the regional level of Gae-sung City, which are eligible for AR CDM project, based on researches of satellite image analyses conducted from 1980's to 1990's. A baseline scenario assumed 44.73 tones of carbon stored in soil per hectare with no vegetation above ground remained during the project period following the default value of IPCC's Good Practice Guidance for LULUCF considering soil structure, climate and land use of the project area. The scenario also assumes that black rocust (Robinia pseudoacacia)is planted and the CDM project is implemented for 20 years. The costs for producing greenhouse gases CER (certified emission reduction) credits include costs of tree planting and forest management, and costs of project negotiation and transactions for issuing the credits. It is estimated that 376 tones of carbon dioxide per hectare can be accumulated and 503 temporary CER credits per hectare and 265 long-term CER credits per hectare could be produced during the project period. It is estimated to cost US$ 4.04 and US$ 7.67 to provide one unit of temporary credit and long-term credit, respectively. These values can be regarded as the cost of conferring emission commitment of a country or a private entity. However, it is not clear which option is bettereconomically because the replacement periods are different in these two cases.
机译:评估了朝鲜AR CDM项目的潜力,并估算了AR CDM项目的可行土地面积。根据我们的估计,根据1980年代以来对卫星图像分析的研究,朝鲜在1990年之前可能有515,000公顷的森林被砍伐,而Gae-sung市的区域一级可能有8,854公顷的森林被纳入AR CDM项目。到1990年代。基准情景假设,根据IPCC关于土地利用,土地利用变化和土地利用的良好实践指导的默认值,考虑项目区域的土壤结构,气候和土地利用,在项目期内,每公顷土壤中储存的碳为44.73吨碳,且没有地上植被残留。该方案还假设种植了黑刺槐(Robinia pseudoacacia),并且CDM项目实施了20年。产生温室气体CER(认证减排量)信用额的成本包括植树和森林管理的成本,以及项目谈判和发行信用额的交易的成本。据估计,在项目期间,每公顷二氧化碳累积量为376吨,每公顷可产生503吨临时CER信用额度和265吨长期CER信用额度。提供一个单位的临时信贷和长期信贷估计费用分别为4.04美元和7.67美元。这些值可以视为授予一个国家或私人实体的排放承诺的成本。但是,尚不清楚哪种选择在经济上更好,因为这两种情况下的更换时间不同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号