首页> 外文期刊>Journal of Explosives Engineering >Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta's West End Combined Sewer Overflow Tunnel Project
【24h】

Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta's West End Combined Sewer Overflow Tunnel Project

机译:竖井的垂直撤退开采节省了亚特兰大西端联合下水道溢流隧道项目的时间和金钱

获取原文
获取原文并翻译 | 示例
           

摘要

Initial planning called for three separate drop shafts and three separate vent shafts to be pulled back from the excavated tunnel with a large diameter raise bore machine. With time constraints and the raise bore machine already in high demand on other shafts, a more "traditional" drill and blast approach was taken on a few of the larger drop shafts. This decision proved to be not only cost effective, but also time-saving as the shafts were excavated simultaneously with the other raise bores.
机译:最初的计划要求使用大口径升孔机将三个单独的下降井和三个单独的通风井从开挖的隧道中拉回。由于时间紧迫,并且对其他竖井的提升钻孔机已经提出了很高的要求,因此在一些较大的落井竖井上采用了“更传统的”钻孔和爆破方法。事实证明,这一决定不仅具有成本效益,而且还节省了时间,因为轴与其他提升孔同时进行了挖掘。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号