首页> 外文期刊>Journal of Engineering & Applied Sciences >Determination of Stresses and Deformation During Measurements with Loading Method on Central Ore Pillars in TREPCA Mine
【24h】

Determination of Stresses and Deformation During Measurements with Loading Method on Central Ore Pillars in TREPCA Mine

机译:TREPCA矿山中央矿柱加载法测量过程中的应力和变形的确定

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The most rational mean of using ore body in TREPCA mine is to put security pillars from the ore, these pillars have square cross section size at starter 10×10 m. This way of formation of pillars is done utilizing central ore troops which have great amount of the ore body. Whether the pillars formed analyzed in terms of sustainability, we can state that they are stabile and they possess a high safety factor. We have to state that for the first time determination of stresses in pillars of ore is done in workshop 130 directly with method of measurements.
机译:在TREPCA矿山中使用矿体的最合理方法是从矿石中安放安全支柱,这些支柱的起始横截面尺寸为10×10 m。这种支柱形成方式是利用具有大量矿体的中央矿工来完成的。无论所形成的支柱是否在可持续性方面进行分析,我们都可以说它们是稳定的并且具有很高的安全系数。我们必须指出,首次在矿山130中直接使用测量方法确定矿石柱中的应力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号