首页> 外文期刊>Diesel & Gas Turbine Worldwide >Valid Points: HArriet Aces Tests: GE's 9HA.01 gas turbine passes three-month validation tests
【24h】

Valid Points: HArriet Aces Tests: GE's 9HA.01 gas turbine passes three-month validation tests

机译:有效点:HArriet Aces测试:GE的9HA.01燃气轮机通过了为期三个月的验证测试

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

There hasn't been a dull moments at GE's Greenville, South Carolina, U.S.A., facility since October 2014. That's because several engineers have been busy running tests on the company's latest gas turbine - the 9HA.01. Those tests commenced at the end of March, leaving GE with its first validated gas turbine in the HA family. The remaining HA gas turbines include the 9HA.02, 7HA.01 and 7HA.02. "The results of the validation exceeded our expectations," said Guy DeLeonardo, general manager, high efficiency gas turbines, GE Power & Water. "Validation is key because you not only have to have the lowest cost of electricity, but you also need reliability and availability."
机译:自2014年10月以来,GE在美国南卡罗来纳州格林维尔的工厂一直没有呆滞的时间。这是因为几名工程师一直在忙于对该公司最新的燃气轮机9HA.01进行测试。这些测试于3月底开始,使GE拥有HA系列中第一台经过验证的燃气轮机。其余的HA燃气轮机包括9HA.02、7HA.01和7HA.02。 GE Power&Water高效燃气轮机总经理Guy DeLeonardo说:“验证的结果超出了我们的预期。” “验证是关键,因为您不仅必须拥有最低的电力成本,而且还需要可靠性和可用性。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号