首页> 外文期刊>Diesel & Gas Turbine Worldwide >Updating Processing Control: GE to supply new controls to GASCO processing plant
【24h】

Updating Processing Control: GE to supply new controls to GASCO processing plant

机译:更新加工控制:GE向GASCO加工厂提供新的控制

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Bu Hasa NGL extraction plant, operated by Abu Dhabi Gas Industries Ltd, (GASCO), is updating its plant to increase processing capacity for its natural gas liquid (NGL) trains 1 and 2, Currently the plant produces 7200 tons of NGL per day. To increase production, GASCO is replacing the turbine and compressor controls with GE's Mark VIe platform and OptiComp Integrated Compressor Controls Suite software. Each train has three Dresser compressors (LP, HP and propane) driven by Rolls-Royce Avon gas turbines.
机译:由阿布扎比天然气工业有限公司(GASCO)运营的Bu Hasa NGL提取工厂正在更新其工厂,以提高其天然气液(NGL)火车1和2的处理能力。目前该工厂每天生产7​​200吨NGL 。为了提高产量,GASCO正在用GE的Mark VIe平台和OptiComp集成式压缩机控制套件软件代替涡轮和压缩机控制。每列火车都有三台由罗尔斯·罗伊斯·雅芳燃气轮机驱动的德莱赛压缩机(LP,HP和丙烷)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号