首页> 外文期刊>Diesel & Gas Turbine Worldwide >Siemens Pre-engineered Modularized CHP Power Plants
【24h】

Siemens Pre-engineered Modularized CHP Power Plants

机译:西门子预先设计的模块化热电联产电厂

获取原文
获取原文并翻译 | 示例
           

摘要

Siemens Power Generation (PG) has launched a modularized small GHP plant based on the SGT-300 industrial gas turbine. The plant, called SSC-300, delivers 7.5 MW of electrical power output and 19 tons/h of steam with a fuel utilization factor of more than 80%. What is new is the pre-engineering concept that has introduced a high degree of standardization. This pre-engineered, standardized approach leads to a higher reliability and quality level of the plant compared with customized solutions, according to the company, due to the use of proven components and pre-planning, while reducing project lead times and the overall risk for the customer.
机译:西门子发电公司(PG)已启动基于SGT-300工业燃气轮机的模块化小型GHP工厂。该工厂称为SSC-300,可提供7.5 MW的电力输出和19吨/小时的蒸汽,燃料利用率超过80%。新的是引入了高度标准化的预工程概念。据该公司称,由于使用了经过验证的组件和预先计划的方法,与定制的解决方案相比,这种预先设计的标准化方法可以提高工厂的可靠性和质量水平,同时减少了项目的交付时间和总体风险。客户。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号