...
首页> 外文期刊>Disaster prevention and management >Building disaster resilience through capacity building in Ethiopia
【24h】

Building disaster resilience through capacity building in Ethiopia

机译:通过埃塞俄比亚的能力建设来增强抗灾能力

获取原文
获取原文并翻译 | 示例

摘要

Purpose – Building institutional capacity to prevent, prepare and respond to disasters is amongaspects emphasized in the Hyogo Framework for Action 2005-2015 to enhance the resilience ofdisaster-affected communities. Lessons from past programmes could help the design andimplementation of future capacity building interventions with a view to making them both a meansand an end in themselves in building disaster resilience of communities and nations. This paper aimsto explore the issues. Design/methodology/approach – The paper is based on the authors' experiences and reports ininstitutional capacity building in Ethiopia. Findings – Institutional capacity building programmes should adopt a non-intervention approach,using existing structures. Programmes should be demand-driven and beneficiary-based rather thansupply-driven and should be holistic and integrated with coordination being an important ingredient.Capacity building is a slow process and unless all partners are willing to make a choice in favour ofassessing and working the holistic and integrated capacity building will struggle to make a lastinginfluence in reducing disasters and their impacts to Ethiopians. Practical implications – With capacity building being at the centre of the building community,resilience, coordination by donors as well as government agencies is fundamental. Originality/value – The paper illuminates areas of good practice as well as complexitiessurrounding the delivery of the disaster resilience through capacity building and how governmentsand development and humanitarian agencies are implicated.
机译:目的–在《 2005-2015年兵库行动框架》中强调了预防,预防和应对灾害的机构能力,以增强受灾社区的复原力。过去计划的经验教训可以帮助设计和实施未来的能力建设干预措施,以使其成为建设社区和国家抗灾能力的手段和目标。本文旨在探讨这些问题。设计/方法/方法-本文基于作者的经验并报告了埃塞俄比亚的机构能力建设。调查结果–机构能力建设计划应采用不干预的方法,并使用现有结构。计划应以需求为导向,以受益人为基础,而不是以供应为导向,应该是整体的,与协调相结合的,这是重要的组成部分。能力建设是一个缓慢的过程,除非所有合作伙伴都愿意做出选择以评估和开展整体工作综合能力建设将努力对减少灾害及其对埃塞俄比亚人的影响产生持久影响。实际意义–以能力建设为建设社区的中心,抵御力,捐助者和政府机构的协调至关重要。原创性/价值–本文阐述了良好实践的领域以及围绕通过能力建设来交付抗灾能力的复杂性,以及如何牵连政府,发展和人道主义机构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号