首页> 外文期刊>The Electricity journal >Do Policies to Encourage Wind Energy Inadvertently Pose Challenges to Electric Power Reliability? Evidence from the 50Hertz Control Area in Germany
【24h】

Do Policies to Encourage Wind Energy Inadvertently Pose Challenges to Electric Power Reliability? Evidence from the 50Hertz Control Area in Germany

机译:鼓励风能的政策是否对电力可靠性提出了挑战?来自德国50赫兹控制区的证据

获取原文
获取原文并翻译 | 示例
           

摘要

An econometric analysis indicates that the higher is wind energy's share of forecasted demand, the more likely it is that the system operator will find it prudent to undertake non-traditional measures to maintain reliability. This should serve as a reminder that policies developed without affording due consideration to important technical issues are apt to run afoul of the law of unintended consequences.Each second, the amount of electricity generated must correspond to the quantity of electricity needed. It is not (yet) possible to store large quantities of electricity. Continuously maintaining the balance between production and consumption is one of our key tasks. The growing share of renewable energies and dynamic developments on the market pose ever greater challenges in day-to-day operations. Particularly the growing share of highly volatile volumes of renewable energies that are difficult to forecast...- 50Hertz, 2010 Annual Report.
机译:计量经济学分析表明,风能在预测需求中所占的份额越高,系统运营商就越有可能会谨慎地采取非传统措施来保持可靠性。这应该提醒人们,在未适当考虑重要技术问题的情况下制定的政策容易违反意料之外的后果法则。每秒产生的电量必须与所需的电量相对应。目前尚无法存储大量电量。不断保持生产与消费之间的平衡是我们的关键任务之一。市场上可再生能源份额的不断增长和动态发展给日常运营带来了越来越大的挑战。特别是难以预测的高挥发性可再生能源份额正在增长...-50Hertz,2010年年度报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号