首页> 外文期刊>Zeus syngas refining report >Bombardier submits application for east Belfast WTE plant
【24h】

Bombardier submits application for east Belfast WTE plant

机译:庞巴迪递交东贝尔法斯特垃圾处理厂申请

获取原文
获取原文并翻译 | 示例
       

摘要

The UK's Department of the Environment (DoE) has asked aerospace firm Bombardier for more information on a planned WTE power station, which would provide electricity for its main factory in east Belfast, BBC News reported. The plant would convert one million tonnes of trash from Belfast and the surrounding area into heat and power using gasification technology. The plant would process 250,000 tonnes of trash per year, about 50 truck loads a day. The DoE also requested more environmental information about its plans. Bombardier wants to reduce its costs by generating its own energy.
机译:据英国广播公司新闻报道,英国环境部(DoE)已要求航空航天公司庞巴迪公司提供有关计划中的WTE电站的更多信息,该电站将为其位于贝尔法斯特东部的主要工厂提供电力。该工厂将利用气化技术将贝尔法斯特及周边地区的100万吨垃圾转化为热能和电能。该工厂每年将处理250,000吨垃圾,每天约装载50辆卡车。美国能源部还要求提供有关其计划的更多环境信息。庞巴迪希望通过产生自己的能源来降低成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号