...
首页> 外文期刊>Zeus syngas refining report >Sindh Engro Coal Mining Developing Pakistani UCG Project Amid Electricity Shortages
【24h】

Sindh Engro Coal Mining Developing Pakistani UCG Project Amid Electricity Shortages

机译:Sindh Engro煤矿在电力短缺的情况下开发巴基斯坦UCG项目

获取原文
获取原文并翻译 | 示例

摘要

Sindh Engro Coal Mining Co. is developing a US$3 billion Thar coal project in partnership with the government of Sindh, Oilprice.com reported. The project is expected to generate 100 MW of electricity by 2016 using Underground Coal Gasification (UCG) technology. The project can then be significandy scaled-up. The project is situated in the desert in Sindh, eastern Pakistan. The Thar project contains 1.4 billion tonnes of low-grade lignite coal reserves believed suitable for UCG. Overall coal reserves in the area exceed 175 billion tonnes of lignite coal. Pakistan's electricity shortages are driving development of the project. Pakistan faces a 5,000 MW shortfall in power generation, fulfilling just 50 percent of demand. Many urban areas in Pakistan are subjected to minimum 8-hour blackouts each day. The bulk of the US$3 billion in financing for the project will come from Chinese sources, according to A Shaikh, CEO of Sindh Engro Coal Mining Co.
机译:Oilprice.com报导,信德省Engro煤矿公司正在与信德省政府合作开发一项30亿美元的塔尔煤炭项目。预计到2016年,该项目将使用地下煤气化(UCG)技术发电100兆瓦。然后,该项目可以进行大规模扩展。该项目位于巴基斯坦东部信德省的沙漠中。塔尔项目包含14亿吨低品位褐煤储备,据信适合于UCG。该地区的煤炭总储量超过1,750亿吨褐煤。巴基斯坦的电力短缺正在推动该项目的发展。巴基斯坦的发电量短缺5,000兆瓦,仅满足50%的需求。巴基斯坦的许多城市地区每天最少要停电8小时。 Sindh Engro Coal Mining Co.首席执行官A Shaikh表示,该项目30亿美元的资金大部分将来自中国。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号