首页> 外文期刊>Zeus liquefied natural gas report >Shell to fuel 'Canadian Green Corridor' by 3Q2012
【24h】

Shell to fuel 'Canadian Green Corridor' by 3Q2012

机译:壳牌在2012年第三季度之前为“加拿大绿色走廊”加油

获取原文
获取原文并翻译 | 示例
           

摘要

Shell will launch it's first LNG fuel project in North America this March, Truck News re- ported Feb. 9. The project envisions the construction of a 0.3-million-tonne-per-year liquefaction plant by 2013 at its Jumping Pound gas processing facility located about 33 kilometers west of Calgary. The LNG would then be supplied to Shell Flying J travel plazas along the "Canadian Green Corridor," an area stretching from Ft. McMurray to Calgary and on to Vancouver. Until then, LNG will be supplied to the Shell Flying J truck stops via third-party supply agreements.
机译:据《卡车新闻》 2月9日报道,壳牌将于今年3月在北美启动其首个LNG燃料项目。该项目预计到2013年将在其Jumping Pound天然气处理厂建设年产30万吨的液化厂。位于卡尔加里以西约33公里处。然后将液化天然气供应给沿着“加拿大绿色走廊”(从Ft延伸的区域)的Shell Flying J旅行广场。麦克默里到卡尔加里,再到温哥华。在此之前,液化天然气将通过第三方供应协议供应给Shell Flying J卡车停靠站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号