首页> 外文期刊>Zeus liquefied natural gas report >Encana Updates Horn River, LNG Operations
【24h】

Encana Updates Horn River, LNG Operations

机译:恩卡纳(Encana)更新霍恩河(Horn River),液化天然气(LNG)业务

获取原文
获取原文并翻译 | 示例
           

摘要

EnCana Corporation (Encana) said the Horn River Basin, first discovered by them in 2003, holds "approximately 500 tcf (trillion cubic feet, 14.2 trillion cubic meters) of natural gas plays," during their Oct. 4 Horn River update call. "The resource base in the Horn River is enormous, highly accessible and will certainly play a key role in North American and even global gas supply in the years to come," said Kevin Smith, vice president of the Fort Nelson business unit. By 2015, he says, output could reach 2 billion cubic feet per day (bcf/d) and 5 bcf/d by 2020. According to the Encana executive vice president and president of the Canadian foothills division Michael Graham, Encana is targeting production of about 95-million cubic feet a day from the basin this year.
机译:EnCana Corporation(Encana)称,霍恩河盆地于2003年首次发现,在10月4日对霍恩河的更新呼吁中,“拥有约500 tcf(万亿立方英尺,14.2万亿立方米)的天然气储量”。尼尔森堡业务部副总裁凯文·史密斯说:“霍恩河的资源基础十分庞大,交通十分便利,并且肯定会在未来几年在北美乃至全球的天然气供应中发挥关键作用。”他说,到2015年,日产量将达到20亿立方英尺(bcf / d),到2020年将达到5 bcf / d。根据Encana执行副总裁兼加拿大山麓分部总裁Michael Graham的说法,Encana的目标是今年距盆地每天约有9,500万立方英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号