Design flaws Geotechnical experts locate the underlying cause of Mount Polley tailings breach

机译:设计缺陷岩土工程专家确定了波利山尾矿破坏的根本原因

获取原文
获取原文并翻译 | 示例
       

摘要

A three-person investigative panel appointed by the government of British Columbia reported in January that a design flaw was responsible for the Mount Polley tailings dam breach in August 2014. The geotechnical experts - Norbert Morgenstern, professor emeritus of civil engineering at the University of Alberta; Steven Vick, a geotechnical engineer and review consultant; and Dirk Van Zyl, a professor of mining engineering at UBC - also issued recommendations to improve future tailings storage facility (TSF) designs, all of which the province pledged to adopt.
机译:由不列颠哥伦比亚省政府任命的一个由三人组成的调查小组于1月份报告称,设计缺陷是造成波利山尾矿坝溃决的原因。2014年8月。岩土工程专家-阿尔伯塔大学土木工程名誉教授Norbert Morgenstern ; Steven Vick,岩土工程师和审查顾问; UBC矿业工程学教授Dirk Van Zyl也发布了建议,以改进未来的尾矿存储设施(TSF)设计,该省已保证全部采用。

著录项

  • 来源
    《CIM Magazine》 |2015年第2期|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 一般性问题;
  • 关键词

  • 入库时间 2022-08-18 09:30:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号