...
首页> 外文期刊>DEMM: Engineering & Manufacturing Magazine >Steel industry seeks changes to subcontractor retention payments
【24h】

Steel industry seeks changes to subcontractor retention payments

机译:钢铁行业寻求改变分包商的保留金

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Structural steel industry body Steel Construction New Zealand (SCNZ) called for greater protection for subcontractors during its submission at a select committee hearing into the Construction Contracts Amendment Bill in Wellington. "The Construction Contracts Act must be amended, particularly with respect to retention payments, to ensure that subcontractors to the building and construction sector are better protected," said SCNZ manager Alistair Fussell. "The collapse of Mainzeal has highlighted the vulnerability of subcontractors and the devastating financial implications such an event can cause." Mainzeal went under owing an estimated $70 million to subcontractors; $20 million of that was in retention payments.
机译:新西兰结构钢行业组织Steel Construction New Zealand(SCNZ)要求在对惠灵顿《建筑合同修正案》进行听证的特选委员会提交的分包商中,提供更大的保护。 SCNZ经理Alistair Fussell表示:“必须修改《建筑合同法》,尤其是在保留金方面,以确保更好地保护建筑和建筑行业的分包商。” “ Mainzeal的倒闭凸显了分包商的脆弱性以及此类事件可能造成的破坏性财务影响。” Mainzeal欠分包商约7,000万美元;其中有2000万美元是留存金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号