首页> 外文期刊>Hunter Valley Coal Report >BMA's Goonyella Riverside Mine to prestrip 52 MBCM per annum using truck and shovel
【24h】

BMA's Goonyella Riverside Mine to prestrip 52 MBCM per annum using truck and shovel

机译:BMA的Goonyella Riverside矿每年将使用卡车和铁锹预先划定52 MBCM

获取原文
获取原文并翻译 | 示例
           

摘要

Eight caterpillar 797B rear dump tracks have been delivered to the Goonyella Riverside coal mine in Central Queensland. The 340t capacity tracks are operated by BHP Billiton Mitsubishi Alliance (BMA). The BMA took over operation of the open cut Goonyella Riverside mine in the Bowen Basin southwest of Mackay in 2001. Since then the mine has been producing around 11.5Mt of prime coking coal annually. However the world's unprecedented demand for coal - largely occurring to satisfy the huge consumption of steel in China - has prompted BMA to expand its operations in the Bowen Basin. In recent years Goonyella Riverside has been one of the few mines in Australia using tracks with more than 240t capacity, so the purchase of the eight 340t Cat 797Bs marks a quantum leap in track size in this country and reflects the scale of BMA's proposed expansion.
机译:八条履带797B的后部卸车轨道已交付至昆士兰州中部的Goonyella Riverside煤矿。 340吨容量的轨道由必和必拓三菱联盟(BMA)运营。 BMA于2001年接手了Mackay西南地区Bowen盆地的Goonyella Riverside露天矿的运营。此后,该矿每年已生产约11.5Mt的主要焦煤。然而,全球对煤炭的空前需求-主要是为了满足中国对钢铁的大量消费-促使BMA扩大了其在Bowen盆地的业务。近年来,Goonyella Riverside一直是澳大利亚为数不多的使用240吨以上履带的矿山之一,因此购买了八台340吨Cat 797B履带标志着该国轨道规模的飞跃,这反映了BMA拟议扩张的规模。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号