...
首页> 外文期刊>Hunter Valley Coal Report >WestSide steps up activities on key projects
【24h】

WestSide steps up activities on key projects

机译:西区加强重点项目的活动

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

WestSide Corporation Limited is set to commence production testing as it steps up appraisal efforts at its two key coal seam gas projects at Paranui and Tilbrook in central Queensland's Bowen Basin. The Company was on track to complete the appraisal drilling programs and bring its projects at Paranui (ATP 769P) and Tilbrook (ATP 688P) into operation within the next few months with all wells forming the three-well Tilbrook pilot had been drilled with workover and pump installation scheduled for a pre-Christmas completion.
机译:WestSide Corporation Limited将着手对其昆士兰州中部Bowen盆地的Paranui和Tilbrook的两个重要煤层气项目进行评估,从而开始进行生产测试。该公司正按计划完成评估钻探计划,并在接下来的几个月内将其在Paranui(ATP 769P)和Tilbrook(ATP 688P)的项目投入运营,构成Tilbrook三井试点的所有油井都进行了修井和钻探。泵的安装计划在圣诞节前完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号