首页> 外文期刊>Hydrology and Earth System Sciences >Towards improved instrumentation for assessing river-groundwater interactions in a restored river corridor
【24h】

Towards improved instrumentation for assessing river-groundwater interactions in a restored river corridor

机译:致力于改进仪器,以评估恢复后的河道中的河水相互作用

获取原文
获取原文并翻译 | 示例
           

摘要

River restoration projects have been launched over the last two decades to improve the ecological status and water quality of regulated rivers. As most restored rivers are not monitored at all, it is difficult to predict consequences of restoration projects or analyze why restorations fail or are successful. It is thus necessary to implement efficient field assessment strategies, for example by employing sensor networks that continuously measure physical parameters at high spatial and temporal resolution. This paper focuses on the design and implementation of an instrumentation strategy for monitoring changes in bank filtration, hydrological connectivity, groundwater travel time and quality due to river restoration. We specifically designed and instrumented a network of monitoring wells at the Thur River (NE Switzerland), which is partly restored and has been mainly channelized for more than 100 years. Our results show that bank filtration - especially in a restored section with alternating riverbed morphology - is variable in time and space. Consequently, our monitoring network has been adapted in response to that variability. Although not available at our test site, we consider long-term measurements - ideally initiated before and continued after restoration - as a fundamental step towards predicting consequences of river restoration for groundwater quality. As a result, process-based models could be adapted and evaluated using these types of high-resolution data sets.
机译:在过去的二十年中,已经启动了河流修复项目,以改善受管制河流的生态状况和水质。由于大多数恢复的河流根本没有受到监控,因此很难预测恢复项目的后果或分析恢复失败或成功的原因。因此有必要实施有效的现场评估策略,例如通过采用以高空间和时间分辨率连续测量物理参数的传感器网络。本文着重于设计和实施一种仪器仪表策略,以监测由于河流恢复而引起的堤岸过滤,水文连通性,地下水流转时间和质量的变化。我们专门设计和安装了Thur河(瑞士东北)的监控井网络,对它进行了部分修复,并且已将其主要渠道化了100多年。我们的结果表明,河床过滤-尤其是在具有交替河床形态的恢复段中-在时间和空间上是可变的。因此,我们的监控网络已针对这种变化进行了调整。尽管在我们的测试地点无法获得,但我们认为长期测量-理想的是在恢复之前进行并在恢复之后继续进行-是预测河流恢复对地下水质量后果的基本步骤。结果,可以使用这些类型的高分辨率数据集来调整和评估基于过程的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号