...
首页> 外文期刊>Hart's E&P >Floatover platform lowers costs: A floating platform, matched to a base offshore, eliminates lifting risk
【24h】

Floatover platform lowers costs: A floating platform, matched to a base offshore, eliminates lifting risk

机译:Floatover平台降低了成本:与离岸基础设施相匹配的浮动平台消除了举升风险

获取原文
获取原文并翻译 | 示例
           

摘要

Oil and gas producers face higher risk as they venture into deeper water to find bigger prospects that require larger, more expensive floating platforms to produce. It's an arena where weight savings is crucial and delays are increasingly expensive. BP is launching the world's largest floating platform over Thunder Horse field in Mississippi Canyon 778 and 822 in the Gulf of Mexico. The platform over BP's Atlantis, in Green Canyon 743, will be the second largest, The company already launched the world's two largest spar platforms for Holstein field in Green Canyon 645 and Mad Dog in Green Canyon 782. BP completed final assembly for Thunder Horse, including the mounting of the platform on the base, at the Kiewit Shipyard in Ingleside, Texas, the only shipyard available with a 90-ft (27-m) hole at quay-side that would allow a float-out of the fully assembled platform. A full assembly at quay-side eliminates the expense of bringing a heavy-lift vessel to the deepwater field site, the time-delay risk of weather challenges, and the monetary and time risk of the lifting vessel dropping a module into water so deep it can't be recovered.
机译:石油和天然气生产商面临更大的风险,因为他们冒险进入更深的水中以寻找更大的前景,需要更大,更昂贵的浮动平台来生产。在这个竞技场上,减轻体重至关重要,延误的成本越来越高。 BP将在墨西哥湾的密西西比峡谷778和822上的雷马场上推出全球最大的浮平台。 BP的Green Canyon 743亚特兰蒂斯平台将是第二大平台。该公司已经为Green Canyon 645的Holstein油田和Green Canyon 782的Mad Dog推出了世界上两个最大的翼梁平台。BP完成了Thunder Horse的最终组装,包括将平台安装在德克萨斯州因格赛德(Ingleside)的Kiewit造船厂的基座上,这是唯一一个在码头侧有90英尺(27 m)孔的造船厂,该孔可以使完全组装好的平台浮出水面。码头一侧的完整装配消除了将重型船带到深水现场的费用,天气挑战的时延风险以及起重船将组件掉入水中的金钱和时间风险无法恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号