首页> 外文期刊>World Pumps >Oil & gas: Bearing installations stand the test of time
【24h】

Oil & gas: Bearing installations stand the test of time

机译:石油和天然气:轴承装置经得起时间的考验

获取原文
获取原文并翻译 | 示例
           

摘要

In the mid-1990s NAM set out to find the most cost-effective way to extract gas from Europe's largest natural gas field. This article explains why Waukesha Magnetic Bearings was chosen to provide the magnetic bearings for every motor-compressor string in the project. Groningen, Europe's largest natural gas field, located in the Netherlands, was discovered in 1959. Production began in 1963 and by the end of the decade, nearly 50% of the field's reserves were depleted. Nederlandse Aardolie Maat-schappij (NAM), a joint venture between Royal Dutch Shell and ExxonMobil, was created in the mid-1990s to find the most cost-effective way to extract gas from the field and extend the life of its reserves, ensuring the field could continue to supply the region.
机译:在1990年代中期,NAM开始寻找从欧洲最大的天然气田中提取天然气的最具成本效益的方法。本文解释了为什么选择Waukesha电磁轴承来为项目中的每个电动压缩机弦柱提供电磁轴承。格罗宁根(Groningen)是位于荷兰的欧洲最大天然气田,于1959年被发现。生产于1963年开始,到本十年末,该油田的储量已接近50%枯竭。荷兰皇家壳牌公司与埃克森美孚公司合资成立了Nederlandse Aardolie Maat-schappij(NAM)公司,该公司成立于1990年代中期,旨在寻找最经济有效的方式从该气田开采天然气并延长其储藏寿命,确保油田可以继续供应该地区。

著录项

  • 来源
    《World Pumps》 |2016年第589期|共2页
  • 作者

    Alan Burrows;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 泵;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号