首页> 外文期刊>Water and Energy International >MODERNIZING IRRIGATION MANAGEMENT OF HEMAVATHY PROJECT USING MASSCOTE APPROACH
【24h】

MODERNIZING IRRIGATION MANAGEMENT OF HEMAVATHY PROJECT USING MASSCOTE APPROACH

机译:运用MASSCOTE方法对血沉项目进行现代化灌溉管理

获取原文
获取原文并翻译 | 示例
           

摘要

Hemavathy reservoir project created by constructing a dam across river Hemavathy in Hassan district of Karnataka to store 1050.60 Mcum (37. 10 TMC) of water and to irrigate 700751 acres during Khariff and Rabi seasons. The network of canal consists ofHemavathy left bank canal, Hemavathy right bank canal, Hemavathi Right Bank High level canal, Tumkur branch canal and Nagamangala branch canal. The total utilization proposed for the project is 56.67 TMC including drinking water needs and evaporation losses. The project is an ongoing project and the total atchkat created to end of March 2008 is 5,82,060 acres. The water is being allowed for irrigation to 1,53,000 acres and on the trial basis for balance area created. There is violation of cropping pattern. To have a management solution for managing the available water resource in an equitable manner, the system was studied by using MASSCOTE Approach.
机译:Hemavathy水库项目是通过在卡纳塔克邦Hassan区的Hemavathy河上修建大坝而创建的,以存储1050.60 Mcum(37。10 TMC)的水量,并在Khariff和Rabi季节灌溉700751英亩的土地。运河网络由Hemavathy左岸运河,Hemavathy右岸运河,Hemavathi右岸高等级运河,Tumkur支渠和Nagamangala支渠组成。该项目的拟议总利用率为56.67 TMC,包括饮用水需求和蒸发损失。该项目是一个正在进行的项目,截止2008年3月,创建的总造价为5,82,060英亩。允许将水灌溉至1,53,000英亩,并在试验基础上建立平衡面积。违反裁剪模式。为了拥有一种可以公平地管理可用水资源的管理解决方案,使用MASSCOTE方法对系统进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号