首页> 外文期刊>Water and Energy International >ASSESSMENT OF EFFICIENCY OF 'INTEGRATED WATER RESOURCES MANAGEMENT IN FERGANA VALLEY' PROJECT IMPACT
【24h】

ASSESSMENT OF EFFICIENCY OF 'INTEGRATED WATER RESOURCES MANAGEMENT IN FERGANA VALLEY' PROJECT IMPACT

机译:费加纳河谷综合水资源管理项目成效评价

获取原文
获取原文并翻译 | 示例
           

摘要

"IWRM-Fergana" project is directed at creation of technical and institutional opportunity for sustainable, equal and equitable water supply to all consumers who participate in agricultural production within a basin. During the project period (2002 - 2008) a huge work was done and positive experience was accumulated in area of water planning and management strategy at different hierarchical levels (canals - Water User Associations - farms). The objective of given work is to assess project's impact onproductivity and efficiency of irrigation water use in Fergana and Andizhan provinces, Republic of Uzbekistan at a level of each province province, rayons, selected Water User Associations (WUA), demonstration plots (DP), rayon demonstration areas (DA) and individual farms (IF) located near the areas.
机译:“ IWRM-Fergana”项目旨在为向流域内参与农业生产的所有消费者提供可持续,平等和公平的供水的技术和体制机会。在项目期间(2002年至2008年),完成了巨大的工作,并在不同等级的水计划和管理策略领域(运河-用水户协会-农场)积累了积极的经验。这项工作的目的是评估该项目对乌兹别克斯坦共和国费尔干纳州和安集延省的生产率和灌溉用水效率的影响,每个省的水平都包括人造丝,选定的用水户协会(WUA),示范区(DP),人造丝示范区(DA)和附近的个体农场(IF)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号