FLOOD HYDROLOGY OF CHAMERA HYDROELECTRIC PROJECT, STAGE - II

机译:瓜美拉水电项目洪水水文学-II

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Excessive and prolonged rainfall on Ravi and Chenab basin from 24-26 Sept 1988 due to orographically reinforced southwest monsoon resulted in largest precipitation depth. Highest peak flows at different gauging stations in both the basin were observedduring this period. At Chamera dam site downstream of Chamera stage-II dam a flood discharge of 6290 cumec has been recorded, which is 2.2 times more than the ever recorded flood peaks at this site. Further at Madhopur on Ravi river peak flow of 16350 cumec has been recorded. In view of this revision of design flood of Chamera stage-II has been done. The study for computation of standard project flood has been carried out with the help of unit hydrograph derived by Collins method and Integer Nash model.
机译:1988年9月24日至26日,由于西南季风在地形上得到加强,拉维和恰纳布盆地出现了过多和长时间的降雨,导致最大的降水深度。在此期间,在两个盆地的不同测量站观测到最高的峰值流量。在Chamera II级大坝下游的Chamera大坝工地,记录的洪水流量为6290立方公尺,是该地点有记录的洪峰的2.2倍。在拉维河的马多普尔进一步记录到峰值流量为16350立方公尺。鉴于对Chamera II期设计洪水的修订,已经完成。借助于Collins方法和Integer Nash模型导出的单位水位图,对标准工程洪水的计算进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号