首页> 外文期刊>Well servicing >ExxonMobil drills wells on Alaska's North Slope First wells to be drilled in the remote gas field since 1983
【24h】

ExxonMobil drills wells on Alaska's North Slope First wells to be drilled in the remote gas field since 1983

机译:埃克森美孚自1983年以来在阿拉斯加北坡的第一口井将在偏远气田进行钻井

获取原文
获取原文并翻译 | 示例
           

摘要

In late October ExxonMobil announced it had successfully drilled and tested two wells ahead of schedule in the remote Point Thomson Unit on Alaska's North Slope.The company had expected to complete the drilling process by the end of 2010. ExxonMobil, which has invested about $1.5 billion in the Point Thomson Unit, pointed out the project is vitally important to the upcoming Alaska gas pipeline development. An Exxon affiliate plans to build a 22-mile pipeline to carry fluids from the Point Thomson development to the existing North Slope network.
机译:十月下旬,埃克森美孚宣布已提前完成在阿拉斯加北坡偏远地区汤姆森单元的两口井的钻探和测试工作。该公司预计到2010年底完成钻探过程。埃克森美孚已投资约15亿美元。 Point Thomson Unit的负责人指出,该项目对于阿拉斯加即将进行的天然气管道开发至关重要。埃克森美孚的关联公司计划建造一条22英里长的管道,以将流体从汤姆逊角开发区输送到现有的北坡网络。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号