...
首页> 外文期刊>Welding Design & Fabrication: The International Magazine of Welding and Fabricating Technology >Pipe root pass in half the time: pipe piling welds support bay bridges
【24h】

Pipe root pass in half the time: pipe piling welds support bay bridges

机译:根管通过时间减少一半:管桩焊接支持托架桥

获取原文
获取原文并翻译 | 示例
           

摘要

Anyone visiting the San Francisco Bay area sees the large number of that shuffle traffic and out of the city. Located on nearby Mare Island in Vallejo, CA, XKT Engineering Inc., takes advantage of its location on the Bay and access to barge transportation, to handle bridge reinforcement and new construction projects. These projects require the use of pipe pilings that run anywhere from 60 to 160 feet in length.
机译:任何访问旧金山湾地区的人都会看到大量的洗牌活动,并流出了城市。 XKT Engineering Inc.位于加利福尼亚州瓦列霍附近的马雷岛,利用其在海湾的位置和驳船运输的便利,来进行桥梁加固和新建筑项目。这些项目需要使用长度为60至160英尺的管道桩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号