首页> 外文期刊>Water Science and Technology >Fast, simultaneous simulation of the integrated urban wastewater system using mechanistic surrogate models
【24h】

Fast, simultaneous simulation of the integrated urban wastewater system using mechanistic surrogate models

机译:使用机械替代模型快速,同步地模拟城市污水综合系统

获取原文
获取原文并翻译 | 示例
           

摘要

The urban wastewater system components (sewer, treatment plant, and river) are often modelled using complex mechanistic models. Mechanistic surrogate models are introduced here as simplified models that still contain some physical knowledge. Surrogate models are faster, but are less but still sufficiently accurate, and require more data to be calibrated. The possibilities of replacing actual field data by virtual data generated with a complex mechanistic model for calibration of the surrogate model are examined. As an example, a series of tanks with variable volume is shown to approximate sufficiently well the flow propagation in the river Zwalm (Belgium) as predicted by the "de Saint-Venant" equations. The three surrogate models can be implemented in the WEST(R) simulator. which makes a simultaneous simulation of the system possible. In this work a connection is made between the ASM1 and the new IWA River Model No. 1 (RWQM 1) by using a translator between the models in such a way that both mass and elemental balances remain closed for the overall system. This approach is illustrated with a case study on the river Lambro (Italy). The dispersion process in this river with steady flow could be modelled by using a tanks in series model, while the water quality in the river was predicted to improve substantially with an increase in hydraulic capacity of the treatment plant. The simulation results with the upgraded plant still need to be checked by field data. [References: 25]
机译:通常使用复杂的机械模型对城市废水系统的组成部分(下水道,污水处理厂和河流)进行建模。机械代理模型在此作为简化模型引入,其中仍包含一些物理知识。代理模型速度更快,但数量较少,但仍然足够准确,并且需要校准更多数据。检验了用复杂的机械模型生成的虚拟数据替换实际现场数据以校准替代模型的可能性。例如,显示了一系列可变容积的水箱,这些水箱可以很好地近似“ Z-Saint-Venant”方程式预测的Zwalm河(比利时)中的水流传播。可以在WEST(R)模拟器中实现这三个代理模型。这使得系统的同时仿真成为可能。在这项工作中,通过使用模型之间的翻译器,使ASM1和新的IWA River No. 1(RWQM 1)之间建立了联系,以使整个系统的质量和元素平衡保持封闭。案例研究以Lambro河(意大利)为例。可以通过使用串联水箱模型来模拟这条稳定水流中的分散过程,而随着处理厂水力的增加,预计河流中的水质将大大改善。升级后的工厂的仿真结果仍然需要通过现场数据进行检查。 [参考:25]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号