首页> 外文期刊>VGB PowerTech >Vilvoorde - Fast track conversion to open cycle GT - A strategic move
【24h】

Vilvoorde - Fast track conversion to open cycle GT - A strategic move

机译:Vilvoorde-快速转换为开放式GT的战略-一项战略举措

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Belgian electricity market is currently facing significant structural shortfalls on the security of supply due to the increasing share of intermittent power supply and the decreasing wholesale prices, which forced several conventional power plants to shut-down or be mothballed. In order to improve the situation, the Belgium Government's so-called "Energieplan Wathelet" was put into force at the beginning of 2014. Amongst others, it obliged existing but mothballed gas-fired power plants to participate in an auction for reserve capacity, starting with the winter 2014/2015. The requirements on availability and power supply on the reserves were those of a peak load power plant.
机译:由于间歇性电力供应的份额增加和批发价格下降,比利时电力市场目前在供应安全方面面临严重的结构性短缺,这迫使数家常规电厂关闭或被封存。为了改善这种状况,比利时政府所谓的“能源计划瓦特莱特”号于2014年初开始生效。除其他外,它迫使现有但封存的燃气电厂参加拍卖,以获得备用容量,从此开始2014/2015年冬季。对储备的可用性和供电的要求是峰值负荷发电厂的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号