Optimised Construction Technology for Modern Coal-fired Power Stations

机译:现代燃煤电站优化施工技术

获取原文
获取原文并翻译 | 示例
           

摘要

The principles necessary to achieve the greatest economic success over the long life cycle of a plant must be set out early in the planning process. To satisfy the demands for better profitability and more rapid project realisation, the design of the plant must suit the construction concept and improved construction planning must take into account the requirements of the final construction process. The plant engineering interfaces are determined by the various functions and are different to those of the construction engineering elements. In plant engineering terms, the power station can be divided into individual buildings according to function, whilst construction engineering considers modules only.
机译:必须在计划过程的早期就确定在工厂的长寿命周期内实现最大经济成功所必需的原则。为了满足更好的盈利能力和更快的项目实现速度的要求,工厂的设计必须适合施工理念,并且改进的施工计划必须考虑最终施工过程的要求。工厂工程接口由各种功能确定,并且与建筑工程元素的接口不同。用工厂工程术语来说,根据功能可以将电站划分为单独的建筑物,而建筑工程仅考虑模块。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号