首页> 外文期刊>VGB PowerTech >An Electricity Market Mechanism Based on Benefit-balanced Transmission Rates
【24h】

An Electricity Market Mechanism Based on Benefit-balanced Transmission Rates

机译:基于利益平衡传输率的电力市场机制

获取原文
获取原文并翻译 | 示例
           

摘要

Grid users may be charged according to how the transmission service they require affects the total cost of the grid. In general, the relevant grid services are considered to be loss compensation LC and congestion compensation CC [4]. In the grid's nodal framework, the LC and CC service costs can be expressed as marginal costs at each node k of the network: MC_k = MC_(lo-k) + MC_(co-k) (1) A power system is said to be "congested" when it operates beyond one or more transmission limits. Congestion management (CM) consists in controlling the transmission system so that no transmission capacity is exceeded.
机译:网格用户可以根据他们需要的传输服务如何影响网格的总成本来收费。通常,相关的网格服务被认为是损失补偿LC和拥塞补偿CC [4]。在电网的节点框架中,LC和CC服务成本可以表示为网络每个节点k的边际成本:MC_k = MC_(lo-k)+ MC_(co-k)(1)称一个电源系统当其运行超出一个或多个传输限制时,将被“阻塞”。拥塞管理(CM)在于控制传输系统,以便不超过传输容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号