Matra Eromu Rt. is both the owner and operator of the Visonta and Bukkabrany opencast mines and produced approximately 7.7 million tonnes of lignite in its own lignite mines which were supplied to the company's power plant in 1999. The flue gas desulphurization (FGD) system for units 3 to 5 of the Matra power plant was inaugurated at the Visonta power plant site in Hungary on October 10, 2000. As a result of this important investment into environmental protection, the Matra lignite-fired power plant will emit about 95 % less sulphur (-96000 t/a) as well as about 80 % less particulate matter into the atmosphere. The volume of the investment into this system amounts to DM 112 million. The total cost of the modernization of the Matra power plant and opencast mining operations amounted to DM400 million.
机译:Matra Eromu Rt。公司是Visonta和Bukkabrany露天矿的所有者和运营商,其自有褐煤矿生产了约770万吨褐煤,这些褐煤矿于1999年供应给该公司的电厂。3至5号机组的烟气脱硫(FGD)系统2000年10月10日,马特拉发电厂的第一座工厂在匈牙利的维松塔电厂落成。由于这项对环境保护的重要投资,马特拉褐煤发电厂的硫排放量将减少约95%(-96000吨/ a),以及减少约80%的颗粒物进入大气。该系统的投资额为1.12亿德国马克。马特拉(Matra)电厂现代化改造和露天采矿业务的总成本达4亿德国马克。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号