FACILITATNG BIGGER MODES

机译:便利的更大模式

获取原文
获取原文并翻译 | 示例
           

摘要

SOLAR TURBINES' NEW ASSEMBLY AND TESTING FACILITY TARGETS A NEW GENERATION OF COMPRESSORS. A new gas compressor test and manufacturing facility (Figure 1) is currently under construction at the manufacturing complex of Solar Turbines Incorporated in San Diego, California. The assembly building was completed recently. The construction of three test stands will be finished by August 2008. The new facility, which adds 10,000 sq. ft, would ensure that gas compressors weighing up to 100 tons can be built and undergo Pressure Test Code (PTC) - 10 Type 1 and Type 2 testing. This would mean that the recently introduced C85 for the Titan 250, which weighs 90 tons can be assembled and closed-loop tested. A C33 compressor is currently being used with the permanently installed Titan 130 for commissioning the facility.
机译:太阳能涡轮机的新组件和测试设施的目标是产生新的压缩机。位于加利福尼亚州圣地亚哥的Solar Turbines Incorporated制造工厂目前正在建设新的气体压缩机测试和制造设施(图1)。装配大楼最近完工。三个试验台的建设将于2008年8月完成。新工厂的面积为10,000平方英尺,将确保可以制造重达100吨的气体压缩机并通过压力测试规范(PTC)-10型1和2型测试。这意味着可以将最近推出的重达90吨的Titan 250的C85进行组装和闭环测试。永久安装的Titan 130目前正在使用C33压缩机进行设备调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号