首页> 外文期刊>Tunnelling & Trenchless Construction >Slipforming floors and walls in Dutch and UK tunnels
【24h】

Slipforming floors and walls in Dutch and UK tunnels

机译:荷兰和英国隧道的地面和墙壁打滑

获取原文
获取原文并翻译 | 示例
           

摘要

WHILE much of TTCs coverage looks at the driving of tunnels for various applications, an equally important part of supplying' a finished tunnel to the owner involves completing and equipping the product'. The first of the tunnels for which this system was employed was the Botlek tunnel on the Betuweroute heavy-freight railway across the southern Netherlands (World Tunnelling March 2003, pp 52-56). Botlek, the country's first bored rail tunnel, is in the heavily industrialised port area south of Rotterdam. The twin tunnel formed part of the new freight railway across the country; this section carries the line under the OudeMaas river. The tunnel was driven at 9.45 m o.d. with a bolted segmental lining bringing the i.d. down to 8.65 m. Each tunnel section stretched 1,835m.
机译:虽然TTC的大部分报道都着眼于各种应用的隧道驱动,但“向业主提供完整的隧道包括完成和装备产品”同样重要。使用该系统的第一条隧道是横跨荷兰南部的Betuweroute重型铁路上的Botlek隧道(2003年3月,世界隧道,第52-56页)。该国第一条无聊的铁路隧道Botlek位于鹿特丹以南的高度工业化的港口地区。双隧道是全国新货运铁路的一部分。这部分是在OudeMaas河下进行的。隧道在9.45 m o.d螺栓固定的衬里带来内径低至8.65 m。每个隧道段长1,835m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号