首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Centralizing control centers: electricidade de Portugal S.A. rolls out integrated SCADA/DMS platform
【24h】

Centralizing control centers: electricidade de Portugal S.A. rolls out integrated SCADA/DMS platform

机译:集中控制中心:葡萄牙电力公司推出集成的SCADA / DMS平台

获取原文
获取原文并翻译 | 示例
       

摘要

Electricidade de Portugal, S.A. (EDP), like many electric utilities around the world, faces the challenge to reduce life-cycle cost, increase customer value and improve flexibility in operation and services. To achieve this goal, EDP has embarked on a computer system integration that spans the various forms of data and services dispersed in many business processes. Computer-based applications have been growing in complexity and interdependence over the last decade. Supervisory control and data acquisition (SCADA) and other technical computing applications must interface with the corporation's information and business activities. The challenge is to ensure that the selected system survives the introduction, replacement or removal of any integrated application, without repeating the "ten year buy everything" cycle of the past.
机译:与世界各地的许多电力公司一样,葡萄牙电力公司(EDP)面临着降低生命周期成本,增加客户价值以及提高运营和服务灵活性的挑战。为了实现此目标,EDP已着手进行计算机系统集成,该系统跨越分散在许多业务流程中的各种形式的数据和服务。在过去的十年中,基于计算机的应用程序的复杂性和相互依赖性不断增长。监督控制和数据采集(SCADA)和其他技术计算应用程序必须与公司的信息和业务活动相接。面临的挑战是确保所选系统在引入,替换或删除任何集成应用程序后仍能幸免,而不必重复过去的“十年购买一切”周期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号