【24h】

ComEd's Field Workforce Modernizes the Grid

机译:ComEd的现场工作人员使网格现代化

获取原文
获取原文并翻译 | 示例
       

摘要

By 2018, Com Ed will have installed 4 million smart meters and 5,300 distribution automation devices in northern Illinois. Up until six years ago, ComEd was operating an analog grid in a digital age. Once the utility secured funding for grid modernization, it began installing smart meters and accelerated attaching distribution automation devices to poles and upgrading underground and overhead infrastructure. The utility first started its smart grid journey in 2009 by installing 130,000 smart meters as a pilot project in its Maywood operating area. Two years later, the Energy Infrastructure Modernization Act (EIMA) authorized $2.6 billion in grid modernization with half of the funding directed toward infrastructure improvements and the remainder allocated to smart grid investments such as installing smart meters and smart switches and modernizing substations.
机译:到2018年,Com Ed将在伊利诺伊州北部安装400万个智能电表和5,300个配电自动化设备。直到六年前,ComEd还在数字时代运营着一个模拟电网。一旦该公用事业公司获得了用于电网现代化的资金,便开始安装智能电表,并加速将配电自动化设备连接到电线杆上,并升级地下和高架基础设施。该公司于2009年开始其智能电网之旅,在其Maywood操作区安装了130,000个智能电表作为试点项目。两年后,《能源基础设施现代化法案》(EIMA)批准了26亿美元的电网现代化,其中一半资金用于基础设施改善,其余资金用于智能电网投资,例如安装智能电表和智能开关以及对变电站进行现代化改造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号