首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Vintage towers: working it hot - careful planning and full-scale tests enable live-line insulator changeouts at PSE&G
【24h】

Vintage towers: working it hot - careful planning and full-scale tests enable live-line insulator changeouts at PSE&G

机译:老式铁塔:高温工作-精心计划和全面测试可在PSE&G更换带电绝缘子

获取原文
获取原文并翻译 | 示例
       

摘要

Competitive pressures combined with regulatory constraints limited new line construction at Public Service Electric and Gas (PSE&G), while demand growth resulted in increased loading on an aging electric transmission infrastructure. Live-line techniques enabled PSE&G, Newark, New Jersey, U.S., to perform routine maintenance functions without taking customers out of service. Live-line work also provided alternatives as PSE&G worked to meet contractual obligations without incurring penalties.
机译:竞争压力加上监管限制限制了公共服务电力和天然气(PSE&G)的新线路建设,而需求增长导致老化的输电基础设施的负荷增加。实时在线技术使PSE&G(美国新泽西州纽瓦克)能够执行例行维护功能,而不会导致客户停止服务。现场热线工作还提供了替代方法,因为PSE&G致力于履行合同义务而不会受到处罚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号