【24h】

Generators partner to compete

机译:发电机合作伙伴竞争

获取原文
获取原文并翻译 | 示例
       

摘要

As Bums & McDonnell developed plans for the satellite station, the interconnection numbers changed. Project in-service dates (ISD) were delayed and, in some cases, locations of facilities were moved from the area. The result was six of the original 11 merchant project terminations were still needed. Merchant plants represented approximately 6500-MW of additional generation (both simple-cycle and combined-cycle power plants). The participants are: Pinnacle West Energy (Redhawk Generating Station) is planning a 2120-MW plant for 2002, located in close proximity of the satellite switchyard. Pacific Gas & Electric Generation (Harquahala Generating Station) is planning a 1100-MW plant for 2002, located approximately 20 miles (32 km) west of Palo Verde. Duke Energy (Arlington Generating Station) is planning a 1250-MW plant for 2002, located a few miles west of Palo Verde. Sempra Energy Resources (Mesquite Power Project) is planning a 1250-MW plant for 2003, located adjacent to the satellite switchyard. Power Development Enterprises (Gila Bend Power Generating Station) is planning a 770-MW plant for 2003, located approximately 20 miles (32 km) south of Palo Verde. The six terminations are still more than the existing switchyard could manage, so the concept of the satellite switching station continued.
机译:随着Bums&McDonnell制定卫星站计划时,互连编号发生了变化。项目启用日期(ISD)被延迟,在某些情况下,设施的位置也从该地区移开了。结果是仍然需要终止最初的11个商人项目中的六个。商厂代表了约6500兆瓦的额外发电量(简单循环和联合循环发电厂)。参与者是:Pinnacle West Energy(Redhawk发电站)正在计划2002年的2120兆瓦发电厂,该发电厂位于卫星开关站附近。太平洋天然气和电力公司(Harquahala发电站)计划在2002年建造一座1100兆瓦的发电厂,该电厂位于帕洛佛得角以西约20英里(32公里)。杜克能源公司(阿灵顿发电站)计划在2002年建造1250兆瓦的发电厂,该电厂位于帕洛佛得角以西数英里处。 Sempra能源资源公司(Mesquite电力项目)计划在2003年建造1250兆瓦的发电厂,该发电厂位于卫星开关站附近。电力开发企业(吉拉本德发电站)计划在2003年建造一台770兆瓦的电厂,该电厂位于帕洛佛得角以南约20英里(32公里)。六个终端仍然超出了现有交换站的管理能力,因此卫星交换站的概念继续存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号