The overhead transmission line spanning the Puget Sound Narrows near Tacoma offers several unique project challenges. EVERY ONCE IN A WHILE WE GET TO DO SOMETHING MEMORABLE. To a transmission line engineer, that memorable event may be designing an extraordinarily long transmission line with a great number of repetitive details to manage, or it may be designing a single span on which nothing is typical. Whatever form the memorable project takes, we all cherish the opportunity and hope for another. In 2003, Tacoma Power (Tacoma, Washington, U.S.) offered POWER Engineers Inc. (POWER; Hailey, Idaho, U.S.) such an opportunity. What ensued was three years of once-in-a-lifetime challenges and entertainment.
机译:跨越塔科马附近的皮吉特海峡的架空输电线路提出了几个独特的项目挑战。每次我们都要做一些令人难忘的事情。对于传输线工程师而言,这一令人难忘的事件可能是设计出一条非常长的传输线,其中包含大量重复的细节要管理,或者它可能正在设计单个跨度,而在该跨度上没有任何典型之处。不论令人难忘的项目采取什么形式,我们都珍惜机遇,并希望有另一个。 2003年,塔科马动力公司(美国华盛顿州塔科马市)为POWER Engineers Inc.(POWER;美国爱达荷州海利市)提供了这样的机会。随之而来的是三年来千载难逢的挑战和娱乐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号