...
首页> 外文期刊>Transactions of the American Fisheries Society >Downstream Passage and Impact of Turbine Shutdowns on Survival of Silver American Eels at Five Hydroelectric Dams on the Shenandoah River
【24h】

Downstream Passage and Impact of Turbine Shutdowns on Survival of Silver American Eels at Five Hydroelectric Dams on the Shenandoah River

机译:雪兰多厄河上五个水电大坝的下游通道和涡轮机停机对美国银鳗生存的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Hydroelectric dams impact the downstream migrations of silver American Eels Anguilla rostrata via migratory delays and turbine mortality. A radiotelemetry study of American Eels was conducted to determine the impacts of five run-of-the-river hydroelectric dams located over a 195-km stretch of the Shenandoah River, Virginia-West Virginia, during fall 2007-summer 2010. Overall, 96 radio-tagged individuals (mean TL = 85.4 cm) migrated downstream past at least one dam during the study. Most American Eels passed dams relatively quickly; over half (57.9%) of the dam passage events occurred within 1 h of reaching a dam, andmost (81.3%) occurred within 24 h of reaching the dam. Two-thirds of the dam passage events occurred via spill, and the remaining passage events were through turbines. Migratory delays at dams were shorter and American Eels were more likely to pass via spill over the dam during periods of high river discharge than during low river discharge. The extent of delay in migration did not differ between the passage routes (spill versus turbine). Twenty-eight American Eels suffered turbine-related mortality, which occurred at all five dams. Mortality rates for eels passing through turbines ranged from 15.8% to 40.7% at individual dams. Overall project-specific mortality rates (with all passage routes combined) ranged from 3.0% to 14.3%. To protect downstream-migrating American Eels, nighttime turbine shutdowns (1800-0600 hours) were implemented during September 15-December 15. Fifty percent of all downstream passage events in the study occurred during the turbine shutdown period. Implementation of the seasonal turbine shutdown period reduced cumulative mortality from 63.3% to 37.3% for American Eels passing all five dams. Modifying the turbine shutdown period to encompass more dates in the spring and linking the shutdowns to environmental conditions could provide greater protection to downstream-migrating American Eels.
机译:水力发电大坝通过迁徙延误和水轮机死亡率影响了白银鳗的下游迁移。进行了一项关于美国鳗鱼的无线电遥测研究,以确定在2007年秋季至2010年夏季,位于弗吉尼亚-西弗吉尼亚州雪兰多厄河195公里处的五个沿河水电站大坝的影响。总体而言,96研究期间,带有无线电标签的个体(平均TL = 85.4 cm)向下游迁移,经过至少一个大坝。大多数美洲鳗鱼相对较快地通过了水坝。超过一半(57.9%)的大坝通过事件是在到达水坝后1小时内发生的,大部分(81.3%)发生在到达水坝的24小时内。大坝通过事件的三分之二是通过溢漏发生的,其余的通过事件是通过水轮机发生的。大坝的迁徙延误更短,在河水流量大的时期,美国鳗鱼更可能通过溢洪道流过大坝。迁移延迟的程度在各通行路线(溢流与涡轮)之间没有差异。 28个美国鳗鱼遭受了与涡轮机相关的死亡率,该死亡率发生在所有五个水坝上。在单个大坝中,通过涡轮机的鳗鱼死亡率在15.8%至40.7%之间。特定项目的总体死亡率(结合所有通过途径的死亡率)在3.0%至14.3%之间。为了保护下游迁移的美国鳗鱼,在9月15日至12月15日实施了夜间涡轮关闭(1800-0600小时),研究中所有下游通过事件的50%发生在涡轮关闭期间。实施季节性涡轮机停机期后,通过所有五个水坝的美国鳗鱼的累积死亡率从63.3%降低到37.3%。修改涡轮机停机期以涵盖春季的更多日期,并将停机与环境条件联系起来,可以为下游迁移的美国鳗鱼提供更大的保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号