Green approach to electrical transmission substation design and implementation

机译:变电站电气绿色设计与实现

获取原文
获取原文并翻译 | 示例
           

摘要

CLP P0wer serves an extensive supply area of 7,000 square kilometres, covering over 70 percent of local electricity demand and over 75 percent of population in Hong Kong. Supporting the economic growth in the territory with an adequate and reliable supply, CLP Power has committed to a significant electrical transmission expansion programme for the next 5 years. During this period, some 20 electrical transmission substations will be erected and commissioned as part of the power systems. In developing these substations, CLP Power is conscious of its obligation in regard to environmental preservation. Proactive means are adopted in the overall operations of its power system for the 'green-being' of the community. There are two basic criteria in the adoption of the 'green' substation approach. Firstly, the design of the substation and the equipment it accommodates should allow economic efficiency and technical effectiveness over its service life. Secondly, the substation is built in an environmentally friendly manner. In this paper, the substation design aspect, covering noise mitigation, natural ventilation, natural lighting, thermal insulation, blending with environment and their harmony support to efficient operation and maintenance of the substation equipment are presented. For the construction phase, a number of control measures are depicted including waste-wise control, non-recycle materials avoidance, noise control and the choice of environmental friendly materials. A prototype design of the 'green' substation is adopted for a CLP Power substation to be commissioned in 2003. An evaluation of the benefits and limitations based on the experience gained in development and application of cost-effective 'Green' Approach in these transmission substations is presented in the paper.
机译:CLP P0wer的供电面积达7,000平方公里,覆盖本地电力需求的70%以上,以及香港人口的75%以上。为提供充足可靠的电力支持本港的经济增长,中电动力已承诺在未来5年进行一项重要的电力传输扩展计划。在此期间,大约20个输电变电站将作为电力系统的一部分进行安装和调试。在发展这些变电站时,中电意识到自己在环境保护方面的义务。在其电力系统的整体运营中,为社区的“绿色生活”采取了积极主动的手段。采用“绿色”变电站方法有两个基本标准。首先,变电站及其容纳的设备的设计应在其使用寿命内实现经济效率和技术有效性。其次,变电站是以环保的方式建造的。本文介绍了变电站的设计方面,涵盖了减噪,自然通风,自然采光,隔热,与环境融合以及它们对变电站设备高效运行和维护的和谐支持。在施工阶段,描述了许多控制措施,包括废物明智控制,避免非循环材料,噪声控制和环保材料的选择。 CLP电力变电站将于2003年投入使用,采用“绿色”变电站的原型设计。基于在这些变电站中开发和应用具有成本效益的“绿色”方法的经验,对收益和限制进行评估。在本文中介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号