首页> 外文期刊>Transactions of the Institutions of Mining and Metallurgy, Section B. Applied Earth Science >Getting it right: preliminary information required to evaluate gold prospects in privatizing economies
【24h】

Getting it right: preliminary information required to evaluate gold prospects in privatizing economies

机译:正确处理:评估私有化经济体中的黄金前景所需的初步信息

获取原文
获取原文并翻译 | 示例
           

摘要

An attempt is made to provide a summary of the main sources of potential error in gold prospect evaluation that could serve as an aid when the problems of estimating grade and tonnage need to be explained to non-experts. The summary covers how to approach the problems of drill-hole spacing and orientation relative to mineralization to arrive at a correct geological interpretation, how bias may be introduced-and avoided-at the stages of drilling, sampling and asaying and how to obtain a two-sided interval estimate from the results of a drilling programme. Particular attention is paid to the uses of orebody classification based on the coefficient of variation, Gy's formula and half absolute relative difference plots.
机译:试图概述金矿前景评估中潜在错误的主要根源,当需要向非专家解释估计品位和吨位的问题时,可以提供帮助。摘要涵盖了如何解决与成矿有关的钻孔间距和方向问题,以得出正确的地质解释,如何在钻孔,取样和浅化阶段引入和避免偏斜,以及如何获得两个钻探程序的结果估算两侧间隔。要特别注意基于变异系数,Gy公式和半个绝对相对差图的矿体分类的用途。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号