Design of the power caverns for Pergau hydroelectric project, Malaysia

机译:马来西亚Pergau水电项目的电洞设计

获取原文
获取原文并翻译 | 示例
           

摘要

A power-generation cavern of 30-m span has beenbuilt in hydrothermally altered granite rock at the Pergauhydroelectric project in northern Malaysia. One implication of thefast-track design-and-build nature of the project was that theadditional site investigation that was needed to provide specificdata for the design had to be undertaken during the early part ofthe construction work. This execution of the design andconstruction work in tandem bed a major influence on the way inwhich the design developed and on the design decisions that had to de made.The development of the design is described, from the initialanalysis, in which relatively simple numerical programs andlimited geotechnical data were employed, to the detailed analyses,in which, principally, the computer program UDEC was usedtogether with discontinuity data acquired during the earlyconstruction phases of the project. The intersection of largefissures containing hot water and hydrothermally altered rock hadnot been predicted from the site investigation undertaken for theproject and the solutions that were engineered for theseunanticipated ground conditions are explained.
机译:马来西亚北部的Pergau水力发电项目在热液蚀变的花岗岩岩石中建造了一个30米跨度的发电洞穴。该项目的快速设计和建造性质的一个含义是,在施工初期必须进行额外的现场调查,以提供具体的设计数据。串联设计和构造工作的这种执行对设计的开发方式和必须做出的设计决策产生了重大影响。从初始分析开始,描述了设计的发展,其中相对简单的数值程序和局限性利用岩土工程数据进行了详细的分析,其中主要是将UDEC计算机程序与在项目早期建设阶段获得的不连续性数据一起使用。对该项目进行的现场调查尚未预测出包含热水和热液蚀变岩石的大裂缝的交点,并解释了针对这些意外地面条件而设计的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号