首页> 外文期刊>Ti02 Worldwide Update >KENMARE: Output at Moma Affected by Floods & Power Outages
【24h】

KENMARE: Output at Moma Affected by Floods & Power Outages

机译:KENMARE:受洪水和停电影响的莫马产量

获取原文
获取原文并翻译 | 示例
           

摘要

The company's ilmenite production for full-year 2015 was 763,500 tonnes - 11% lower than in 2014. Zircon and rutile production in 2014 were at similar levels to those reported for 2014. During January and February 2015, northern Mozambique was affected by severe rainfall and flooding, worse than at any time since the mid-1980s. The power transmission infrastructure was damaged and the Moma mine was without access to national grid power supplies for 57 days. The company relied on its captively owned diesel-fuelled generators and its Dip Doctor (for voltage stabilisation) to maintain operations, albeit at a reduced level.
机译:该公司2015年全年的钛铁矿产量为763,500吨,比2014年减少11%。2014年的锆石和金红石产量与2014年的水平持平。2015年1月和2月,莫桑比克北部受到严重降雨和洪水,比1980年代中期以来的任何时候都更严重。输电基础设施受损,莫马矿57天都无法使用国家电网电源。该公司依靠自己拥有的柴油发电机和Dip Doctor(用于稳定电压)来维持运行,尽管水平有所降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号