首页> 外文期刊>The Roughneck >Nine Energy Service Close to Perfection. Far From Ordinary. Driven to Succeed.
【24h】

Nine Energy Service Close to Perfection. Far From Ordinary. Driven to Succeed.

机译:九能源服务接近完美。远非普通。开车成功。

获取原文
获取原文并翻译 | 示例
           

摘要

The life of an oil and gas well depends on exploration, months of well planning, weeks of drilling, and results from completion. Well completions incorporate the steps taken to transform a drilled well into a producing well. These steps include casing, cementing and perforating. Getting product from the reservoir to the surface safely and efficiently is paramount. Nothing in the oilfield is predictable, and maximizing production and costs in this almost historic downturn can be a tough balancing act for every company.
机译:油气井的寿命取决于勘探,规划的月份,钻探的周数以及完井的结果。完井包括将钻井转换成生产井所采取的步骤。这些步骤包括套管,固井和射孔。安全有效地将产品从储罐运送到地面是至关重要的。油田中没有什么是可以预料的,而在这种几乎历史性的低迷时期,最大化生产和成本对每个公司而言都是艰难的平衡举动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号