...
首页> 外文期刊>The Saudi Aramco journal of technology >Deployment of the World's Longest Sandstone Production, Nozzle-based ICD, Partially Cemented System in an Offshore Horizontal Well
【24h】

Deployment of the World's Longest Sandstone Production, Nozzle-based ICD, Partially Cemented System in an Offshore Horizontal Well

机译:在海上水平井中部署世界上最长的砂岩生产,基于喷嘴的ICD部分胶结系统

获取原文
获取原文并翻译 | 示例
           

摘要

Given the current downturn in the oil and gas industry, the smart design and implementation of state-of-the-art drilling and completion technologies are key factors toward an optimum return on investment. The goal is cost savings, a maximum productivity index, and an effective operational strategy with minimum risks involved. As part of these efforts, Saudi Aramco successfully deployed the world's longest 4 1/2" partially off-bottom cemented liner with a sandstone production equalizer system in an offshore field in Saudi Arabia.
机译:鉴于当前石油和天然气行业的低迷,最先进的钻井和完井技术的智能设计和实施是实现最佳投资回报的关键因素。目标是节省成本,提高生产率指数和有效的运营策略,同时将风险降至最低。作为这些努力的一部分,沙特阿美公司在沙特阿拉伯的一个海上油田成功部署了世界上最长的4 1/2“部分离井底水泥衬砌和砂岩生产均衡器系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号