...
首页> 外文期刊>The Northern Miner. >Positive feasibility for Banro's Twangiza project
【24h】

Positive feasibility for Banro's Twangiza project

机译:Banro Twangiza项目的积极可行性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Banro's (BAA-T, BAA-X) wholly-owned Twangiza project in the Democratic Republic of the Congo will produce about 320,000 oz. gold per year at an average operating cash cost of 274 US dollars per oz. for the first three years it is in production. A feasibility study released Jan. 26 has demonstrated the proposed mine would average annual production of 319,962 oz. gold for the first three years and 261,965 oz. gold for the first five years of operation at an average operating cash cost of 358 US dollars per oz.
机译:Banro(BAA-T,BAA-X)在刚果民主共和国的独资Twangiza项目将产生约320,000盎司的水。黄金,每年平均运营现金成本为每盎司274美元。在开始的三年中。 1月26日发布的可行性研究表明,拟建矿山的年平均产量为319,962盎司。前三年的黄金和261,965盎司。头五年的黄金运营平均现金成本为每盎司358美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号