首页> 外文期刊>The Northern Miner. >Trevali sees future at old Santander mine
【24h】

Trevali sees future at old Santander mine

机译:特雷瓦利在桑坦德老矿山上看到未来

获取原文
获取原文并翻译 | 示例
       

摘要

Late last year, Trevali Resources (ZINC-C, TREVF-O) purchased the past-producing Santander mine in Huaral province, Peru, and along with it, a 1,000-tonne-per-day mill, a 1,000-person camp complete with a school and hospital, a tailings pond containing more than 5 million tonnes of material hosting significant zinc and a 1.5-megawatt dedicated hydroelectric power plant. Since project have been turning out some high-grade silver-zinc-lead numbers and the company has put in place a two-phase production plan for Santander. The first stage is to restart the mill to process material from the tailings pond just a few hundred metres distant. Santander operated as a lead-silver mine for 20 years, directing the ore's zinc straight into the tailings facility. For another 15 years of operation, zinc was recovered but low metal prices dictated a 6 percent zinc cutoff and a coarse crush size led to poor recoveries, adding more zinc to the tailings. The result is a bulk-tonnage, low-cost, readily exploitable zinc resource.
机译:去年底,特雷瓦利资源公司(ZINC-C,TREVF-O)购买了秘鲁华拉尔省过去生产的桑坦德矿山,并与之一起购买了一座日产量为1000吨的磨坊,一个1000人的营地,在学校和医院中,一个尾矿池包含超过500万吨的材料,其中蕴藏着大量的锌,还有一座1.5兆瓦的专用水力发电厂。由于项目已经确定了一些高品位的银锌铅数字,该公司已经为桑坦德制定了两阶段的生产计划。第一步是重新启动磨机,以加工距尾矿池仅几百米的物料。桑坦德(Santander)作为铅银矿开采了20年,将矿石中的锌直接引入尾矿设施。再运行了15年后,锌得到了回收,但是低金属价格要求锌的截留率达到6%,粗碎物的大小导致回收率低,使尾矿中添加了更多的锌。结果是散装吨位,低成本,易于开采的锌资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号