...
首页> 外文期刊>The Northern Miner. >Florence prefeasibility lifts Curis
【24h】

Florence prefeasibility lifts Curis

机译:佛罗伦萨的可预举性提升了库里斯

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Curis Resources (CUV-T) bucked two of the mining sector's most persistent problems - creeping capital costs and rising operating expenses - with a prefeasibility study for its Florence copper project in Arizona that lowers initial costs by 18%, and predicts an operation that produces copper for US79 cents per lb. over its 25-year lifespan. Curis completed a preliminary economic assessment (PEA) of Florence in late 2010, shortly after acquiring the project. For that study, the company relied primarily on historic data. Two years and a whack of work later, Curis has a new economic study based on contemporary costs and estimates - and the project is stronger for it.
机译:Curis Resources(CUV-T)通过其亚利桑那州佛罗伦萨铜矿项目的可行性研究,解决了采矿业最持久的两个问题-不断攀升的资本成本和不断上升的运营支出,该研究将初始成本降低了18%,并预测了将产生的运营成本铜在其25年的使用寿命中为每磅79美分。在收购项目后不久,Curis于2010年底完成了佛罗伦萨的初步经济评估(PEA)。对于该研究,该公司主要依靠历史数据。两年后,经过大量工作,库里斯进行了一项基于当代成本和估算的新经济研究-该项目为此而做得更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号