首页> 外文期刊>Quarterly Journal of Engineering Geology and Hydrogeology >Transport of Mecoprop through Mercia Mudstone and Oxford Clay at the laboratory scale
【24h】

Transport of Mecoprop through Mercia Mudstone and Oxford Clay at the laboratory scale

机译:在实验室规模下,通过默西娅·穆德斯通和牛津黏土运输甲丙酸

获取原文
获取原文并翻译 | 示例
           

摘要

Laboratory column tests have been carried out to assess the transport behaviour of Mecoprop in Mercia Mudstone clay and Oxford Clay. Artificially consolidated clay samples were compressed in a triaxial cell to stresses representative of those at the base of a landfill. Uniform steady flow was achieved, and there was no evidence of ‘bypass’ flow in one or more fast streamtubes. Analysis of Mecoprop and bromide breakthrough curves showed that the transport characteristics were linear (within noise), with no evidence of irreversible sorption. The possibility of dual-porosity or kinetic sorption processes was not conclusively eliminated. Truncated temporal moments allowed estimates of the linear retardation factor for Mecoprop, which were shown to be a lower bound. Based on modelling, the retardation factor of Mecoprop in Oxford Clay was estimated to be 17.1, compared with 65.4 in batch sorption tests. The mean retardation factor for Mecoprop in Mercia Mudstone was 3.6, whereas the value from batch sorption tests was 10.0. These data confirm that retardation factors calculated from sorption isotherms obtained from batch experiments on disaggregated samples substantially overestimate the retardation likely to be observed in compacted clay liners; therefore values from batch tests should be used with caution in groundwater risk assessments.
机译:已经进行了实验室色谱柱测试,以评估Mecoprop在Mercia泥岩粘土和牛津粘土中的运输行为。将人造固结的粘土样品在三轴孔中压缩,使其代表垃圾场底部的应力。实现了均匀稳定的流量,并且没有证据表明一个或多个快速流管中存在“旁路”流量。 Mecoprop和溴化物的穿透曲线分析表明,传输特性是线性的(在噪音范围内),没有不可逆吸附的迹象。没有最终消除双重孔隙或动力学吸附过程的可能性。截断的瞬时力矩允许估计Mecoprop的线性延迟因子,这被证明是一个下限。根据建模,牛津粘土中Mecoprop的延迟因子估计为17.1,而批次吸附测试中的延迟因子为65.4。 Mercia泥岩中Mecoprop的平均延迟因子为3.6,而批次吸附测试的值为10.0。这些数据证实,由分批样品上的分批实验获得的吸附等温线计算出的延迟因子大大高估了压实粘土衬层中可能观察到的延迟。因此,在地下水风险评估中应谨慎使用批次测试的值。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号