...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >A queuing approach for making decisions about order penetration point in multiechelon supply chains
【24h】

A queuing approach for making decisions about order penetration point in multiechelon supply chains

机译:一种决定多级供应链中订单渗透点的排队方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study is dedicated to order penetration point (OPP) strategic decision making which is the boundary between make-to-order (MTO) and make-to-stock (MTS) policies. A multiproduct multiechelon production supply chain is considered where the first production stage manufactures semifinished products based on an MTS policy to supply the second production stage which operates on the MTO policy. The producer desires to find the optimal fraction of processing time fulfilled by supplier and optimal semifinished products buffer capacity in OPP. To calculate system performance indexes, the matrix geometric method is employed. Afterward, optimal solutions are obtained by enumeration and direct search techniques. Moreover, the system behavior is analyzed by the numerical example. It is shown that system total cost is a concave function of increasing completed percentage in first production stage. According to the total cost function elements, managers desire to locate OPP where to balance the order fulfillment delay cost, holding cost and the cost of disposing unsuitable items. Finally, the impact of different amounts of storage capacity on OPP and total cost are analyzed. Also, the manner of expected numbers of unsuitable products, semifinished products, and expected order completion delay are analyzed versus various quantities of storage capacity and production rate.
机译:这项研究致力于订单渗透点(OPP)战略决策,这是按订单生产(MTO)和按库存生产(MTS)政策之间的边界。考虑多产品多级生产供应链,其中第一生产阶段根据MTS政策制造半成品,以供应根据MTO政策运作的第二生产阶段。生产商希望找到供应商能够满足的最佳加工时间比例,以及OPP中最佳的半成品缓冲能力。为了计算系统性能指标,采用矩阵几何方法。之后,通过枚举和直接搜索技术获得最优解。此外,通过数值示例分析了系统行为。结果表明,系统总成本是提高第一生产阶段完成百分比的凹函数。根据总成本功能要素,管理人员希望将OPP放置在哪里,以平衡订单履行延迟成本,持有成本和处置不合适物品的成本。最后,分析了不同数量的存储容量对OPP和总成本的影响。此外,针对各种数量的存储容量和生产率,分析了不合适产品,半成品的预期数量和预期订单完成延迟的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号