...
首页> 外文期刊>The Asia Miner >Exploration at Zhongqu and Diebu
【24h】

Exploration at Zhongqu and Diebu

机译:中qu和迭部的探索

获取原文
获取原文并翻译 | 示例

摘要

RED Mountain Mining has started structural surface and underground geology studies at the Xinqu mineralized area within the Zhongqu project to assist interpretation of the gold mineralization. The ASX-listed company is also commencing exploration work at the Diebu project with access to exploration adits. Due to above average rainfall, the stage II underground drilling program at Zhongqu was delayed until December. This program is designed to follow-up the exciting Stage I drilling results, including a best intersection of 31 metres @ 4.61 grams/tonne gold.
机译:RED Mountain Mining已开始在中曲项目内的新曲矿化区进行结构地表和地下地质研究,以协助解释金矿化。这家在澳交所上市的公司还开始在Diebu项目进行勘探工作,并获得勘探准入权。由于降雨量高于平均水平,中区的第二阶段地下钻探计划被推迟到12月。该程序旨在跟踪令人兴奋的第一阶段钻探结果,包括31米@ 4.61克/吨金的最佳交集。

著录项

  • 来源
    《The Asia Miner 》 |2012年第1期| 共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号