RED Mountain Mining has started structural surface and underground geology studies at the Xinqu mineralized area within the Zhongqu project to assist interpretation of the gold mineralization. The ASX-listed company is also commencing exploration work at the Diebu project with access to exploration adits. Due to above average rainfall, the stage II underground drilling program at Zhongqu was delayed until December. This program is designed to follow-up the exciting Stage I drilling results, including a best intersection of 31 metres @ 4.61 grams/tonne gold.
展开▼