首页> 外文期刊>The Asia Miner >India Resources secures coal mine contract
【24h】

India Resources secures coal mine contract

机译:印度资源公司获得煤矿合同

获取原文
获取原文并翻译 | 示例
           

摘要

INDIA Resources has executed a life of mine coal operations contract with Prism Cement to develop and operate the first phase of Prism's Sial Ghogri coal deposit over a period expected to exceed 30 years. Once operational, the first phase will produce 9.06 million tonnes of coal with a total contract value of Aus$249 million. The coal block is in the Pench-Kanhan Valley Coalfields of the Chhindwara district in Madhya Pradesh state. Production is for the sole consumption of Prism and the mine will be a critical source of energy, underpinning Prism's rapid growth in India.
机译:印度资源公司已与Prism Cement签订了一份终身煤矿运营合同,以开发和运营Prism的Sial Ghogri第一阶段煤炭矿床,预计将超过30年。一旦投入运营,第一阶段将生产906万吨煤炭,合同总价值为2.49亿澳元。煤块位于中央邦的钦德瓦拉地区的潘奇-坎汉山谷煤田。生产是棱镜的唯一消耗,而矿山将成为关键的能源,支撑了棱镜在印度的快速增长。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号